The Planning, Construction of Microtunneling Projects

Planning The first consideration is determining the pipeline line and grade. This may sound simple, but locating the position of your pipeline requires an intimate understanding of the ground conditions, and the microtunneling equipment and its capabilities, in order to save costs and avoid problems during construction.

Piping & Instrument Diagrams - AIChE

Spec Breaks •A Line /Code changes every time ANY ELEMENT in the code changes IE 3"AARX-304L S/S-1"F --> 3"AARX-304L S/S at the point where the fluid has cooled enough to eliminate the insulation. 3"AARX-304L S/S-1"F 3"AARX-304L S/S

The Horizontal Directional Drilling Process

pipeline construction are similar to those of an oil well drilling rig with the major exception being that a horizontal drilling rig is equipped with an inclined ramp as opposed to a vertical mast. HDD pilot hole operations are not unlike those involved in drilling a directional oil well. Drill pipe and

Mining & Petroleum Drafting - Drafting services Australia ...

Our aim is to produce cost effective drawings of the highest level of accuracy and quality to meet the needs for your company. We can accommodate virtually any project, from structural drafting to mechanical drafting design, piping drafting to 3-dimensional drafting and virtually any type of 2D drafting and AutoCad 3D services in between.

Guide Specification for Copper and Copper Alloy Building ...

A. Pipe and pipe fittings as used in this specification also refer to tube and tube fittings. B. Pipe Threads: ASME B1.20.1 American Standard Tapered Pipe Threads for factory-threaded pipe and pipe fittings. 2.2 - PIPES AND TUBES A. General: The application of the following pipe, tube, and fitting materials and joining methods required

Underground Piping (U/G) Piping - Part 2

Under piping are generally arranged based on the location of the consumers and the also depends upon the depth for the soil surface. Some of the guidelines for routing of the underground piping are stated below: 1. The overall Plot Plan allocates the space for the major underground services in the beginning of …

Types and Applications of Engineering Drawings

ASME STANDARDS COMMITTEE Y14 Engineering Drawings and Related Documentation Practices rrhe following is the roster of the Committee at the time of approval of this Standard.}

Technical Report: Design and Evaluation of Tailings Dams ...

the recent attention paid to impoundment design in other types of facilities. Perhaps triggered by the initial attention to uranium impoundments, the increasing concern for environmental performance has led to better engineering design of tailings dams in other mining industry sectors, for both stability and environmental performance.

Guidelines for Design of Dams

A design report, submitted with the application, should include an evaluation of the foundation conditions, the hydrologic and hydraulic design and a structural stability analysis of the dam. The report should include calculations and be sufficiently detailed to accurately define the final design and proposed work as represented on the construction

Technical Standard TS 112 - SAWater - Home

The code formats specified in this Technical Standard and the codes specified on Standard Drawings 4003-00001-01 and 4003-00001-02 are specifically for use on P&IDs but may be used in other applications as appropriate (often on a general arrangement drawing showing a P&ID tag reference on a pipe, valve and/or other equipment for process clarity).

Three-View, Plan View and Elevation View Drawings

Fig. 2-22 is a pictorial drawing of a simple piping sit- uation using screwed pipe and fittings with the fittings numbered and the pipe lettered. To give a complete de- scription of this piping situation using a plan and eleva- tion view, at least lwo views as in Fig. 2-23 would be piq needed. Plan 0 Elevation Elevation Elevation Elevation

Engineering Standards Manual: Standard Drawings & Details

LANL Standard Drawings and Details either (1) depict required format/content or (2) are templates that are completed by a Design Agency (LANL or external AE) for a design drawing package, in a manner similar to specifications.

(PDF) Mining Methods: Part I-Surface mining

Solution mining includes both borehole mining, such as the methods used to extrac t sodium chloride or sulfur, and leaching, either through drillholes or in dumps or heap s on the surface. 2 ...

24. Fire Hydrants.

7) Do not design blocking for fire hydrant tees. Restrain all pipe between the tee and the fire hydrant, see Part Three, Section 27 (Thrust Restraint Design for Buried Piping). 8) When PVC is used for the mainline piping, connect the tracer wire to the fire hydrant base elbow; see Standard Details W/8.0 and W/8.1. d. Fire Hydrant Spacing.

Caltrans Geotechnical Manual

pipe installation. • • • • ... OSHA Mining and Tunneling Unit for the construction of the project. Feasibility Study . Do not perform geotechnical design or analysis for Caltrans trenchless construction projects. ... Shop drawings Daily construction records

CONSTRUCTION SITE LAYOUT PLANNING 1.

project type, scale, design, location, and organization of construction work. Site planning in particular, has been the most neglected aspect in the construction industry and the attitude of the engineers has been that it will be done as the project progress.

Project Execution Plan for Major Civil Works McArthur ...

protection of the gas pipeline The proposed civil works are shown on the layout plan drawing BEE508-C-DWG-002. 2.2 Exclusions The following items are not part of this scope of work: x Relocation of mine services. x Mine hardstand area. x Mine workshop. x Additional accommodation. x Revegetation of diversion and flood protection bund batters.

Guidelines for the Design of Buried Steel Pipe July 2001

Guidelines for the Design of Buried Steel Pipe July 2001 Page 2 13.0 Fluid Transients 14.0 In-Service Relocation A dimensionally consistent set of units is used throughout, unless units are specifically called out. For typical pressure piping applications, the pipe demand calculations for some of these load

DIESEL TRANSPORT, STORAGE AND REFUELLING …

In the design of a diesel fuel storage and refuelling facility for an underground mine a number of factors need to be considered; the location, method of construction, transportation of fuel to the installation, ventilation, hazards to persons and other facilities, fire procedures

Basics of an open pit mine

The selection of physical design parameters and the scheduling of the ore and waste extraction program are complex engineering decisions of enormous economic significance. The planning of an open pit mine is, therefore, basically an exercise in economics, constrained by certain geologic and …

Rotary Drilling Brochure - Mining and Rock Technology

Mining we can offer your total drilling solution. We now have the broadest offerings in the industry, including premium quality drill pipe, rotary subs and adapters, stabilizers, deck bushings, shock subs, and of course rotary bits. As the world's premier supplier of roller cone bits, we provide products and expertise to improve drilling

LaMar TEK

LaMar TEK specializes in Conceptual Design for the Mining and Specialized Construction Industries including Material Handling, Heap Leach Stacking, Innovative Pipeline Construction and At-the-Face Mining Systems. Concept Drawings. Equipment Layouts. Design Reviews 3D Models.

Mine Design, Planning, and Surveying Software — MineCycle

Mine Design Software. Whether you are an owner seeking more optimal mine plans or an EPC seeking winning BMH designs, Bentley's mine design applications can improve your business. Speed planning with rule-based design and on-the-fly scheduling and evaluation. Create more optimal plans by using the time savings to explore more scenarios.

Design standards - Water Corporation

Design standards. We maintain standards in a number of areas to record our best practice and ensure consistency in the design of our assets. Access key standards and specifications here. The following standards are primarily used by Design Engineers to produce designs and contract documents that deliver acceptable assets.

6. Design examples

6. Design examples 6.6 West iastormWatermanagement & DesignguiDancemanual Equation 4.1 NOTE: The minimum stone depth based on the design Treatment Volume is defined by Equation 4.1. How-ever, the minimum stone depth for permeable pavement will often be …

Specification for Installation of Underground Conduit Systems

STANDARD DRAWINGS shall mean those drawings illustrating typical installations and/or specifying materials to be used. Technical Safety British Columbia (TSBC) - Independent, self-funded organization that has jurisdiction over the safe installation and operation of customer owned technical systems and equipment across British Columbia.

ductile iron pipe cad drawing - BINQ Mining

Dimensional catalogs, AutoCAD drawings for Cast Iron Pipe and Fittings. Call us: (800) 438-6091 (704) 348-6450 Contact Us Form Home: Products: Customer …. » More detailed.

Gold Mining Equipment - 911Metallurgist

911MPE has small gold mining equipment for sale and more specifically mineral processing equipment.Our equipment is best used in small-scale extractive metallurgy operations operated by small miners or hobbyist prospectors and mining fanatics. 911MPE' offers gold mining equipment as well as processing equipment applicable to most base metals such as copper, lead, and zinc.

PIPING ISOMETRICS

What is an Isometric Drawing? An isometric drawing is a type of pictorial drawing in which three sides of an object can be seen in one view. ISOMETRIC DRAWINGS ISOMETRIC DRAWINGS -- Dimensions It's popular within the process piping industry because it can be laid out and drawn with ease and portrays the object in a realistic view.

6. Pipelines. A. General Map(s).

contains additional information concerning: preparing a design data collection request, design data collection requirements, and coordinating the design data collection and submittal. The design data collection requirements included in this section cover pressure and gravity or open (low-pressure) pipeline systems. A. General Map(s).